Mesa 500-kV Substation Project (Lake or Streambed Alteration Agreement No. 1600-2016-0034-R5
6 Documents in Project
Summary
SCH Number
2015061014
Lead Agency
California Public Utilities Commission
(CPUC)
Document Title
Mesa 500-kV Substation Project (Lake or Streambed Alteration Agreement No. 1600-2016-0034-R5
Document Type
NOD - Notice of Determination
Received
Posted
6/7/2017
Present Land Use
various
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0034-R5, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Southern CA Edison, as represented by Hazem Gabr. The project proposes to construct a new 500/220/66/16-kV Mesa Substation and demolish the existing 220/66/16-kV substation to increase the substation's footprint from approx. 22 acres to 69 acres. The project will also replace (through removal and installation) and modify transmission lines, subtransmission lines, and distribution structures to accommodate the new 500/220/66/16-kV Mesa Substation. Other project activities include installation of new telecommunication lines, modifications to an existing telecommunication line, temporary modifications to 220-kV equipment at several existing substations to prevent electrical outages during construction, relocation of an existing 72-inch water pipe that traverses the substation site, electrical and/or telecommunications equipment upgrades at 27 existing substations, and undergrounding three spans of overhead streetlight conductor.
Contact Information
Name
Steve Gibson
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Pasadena
Counties
Los Angeles
Cross Streets
Potrero Grande Dr and Greenwood Ave., Monterey Park
Zip
90640
Total Acres
72.1
Parcel #
various
State Highways
multipe
Railways
multiple
Schools
multiple
Waterways
multiple
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes