Mesa 500 kV Substation Project

6 Documents in Project

Summary

SCH Number
2015061014
Lead Agency
Public Utilities Commission (California Public Utilities Commission)
Document Title
Mesa 500 kV Substation Project
Document Type
NOD - Notice of Determination
Received

Document Description
The Mesa 500-kV Substation Project would include demolishing the existing 21.6 acre Mesa 220/66/16-kV Substation and constructing a new 72.1 acre substation at the same site. Other activities would include transmission, subtransmission, and distribution structure work; relocation of a waterline at the substation site; new and modified telecommunications lines; temporary modifications at a Pasadena Substation; equipment upgrades at 27 substations; undergrounding of overhead streetlight conductor spans; and replacement of a transmission structure.

Contact Information
Lisa Orsaba
California Public Utilities Commission
505 Van Ness Avenue
San Francisco, CA 94102-3298

415-703-1966

Location

Coordinates
34°2'9.733"N 118°6'42.7"W
Cities
Pasadena
Counties
Los Angeles
Cross Streets
Potrero Grande Dr and Greenwood Ave., Monterey Park
Zip
90640
Total Acres
72.1
Parcel #
various
State Highways
multipe
Railways
multiple
Schools
multiple
Waterways
multiple

Notice of Determination

Approving Agency
CA Public Utilities Commission
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
505 Van Ness Ave., San Francisco, CA 94102

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
Yes
(5) Findings were made pursuant to the provisions of CEQA
Yes