Routine Maintenance of Stream Channels and Drainage Facilities

7 Documents in Project

Summary

SCH Number
2015052059
Lead Agency
Elk Grove, City of (City of Elk Grove)
Document Title
Routine Maintenance of Stream Channels and Drainage Facilities
Document Type
NOD - Notice of Determination
Received
Posted
8/18/2015
Present Land Use
LU: stream channels and storm drainage facilities

Document Description
The City of Elk Grove Development Services (City) proposes to enter into a 12-yr Streambed Alteration Agreement (DFG Agreement) with the DFG and a Regional General Permit with the US Army Corps of Engineers (USACE) for the City to continue on-going maintenance activities, including removal of silt, sand, sediment, debris, vegetation, and obstructions; minor erosion control, work and repair of previous erosion control work; bridge washing and painting; and geotechnical sampling. The project will perform these routine channel maintenance activities at various improved and unimproved drainage channels/waterways throughout the City. These waterways include Laguna Creek, Toad Creek, Elk Grove Creek, Strawberry Creek, Whitehouse Creek, Sheldon Creek, Grant Line Channel, Franklin Creek, Shed A Channel, Shed C Channel, and several unnamed creeks within the City limits. City staff would also maintain three pump stations and 18 detention/water quality basins.

Contact Information
Christopher Jordan
City of Elk Grove
8401 Laguna Palms Way
Elk Grove, CA 95758

Phone : (916) 478-2222

Location

Cities
Elk Grove
Counties
Sacramento
Cross Streets
Various
State Highways
SR-99, I-5
Railways
UPRR
Schools
Various
Waterways
Laguna, Elk Grove, Sheldon, Strawberry, Whitehouse

Notice of Determination

Approving Agency
City of Elk Grove
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
City of Elk Grove, 8401 Laguna Palms Way, Elk Grove, CA 95758

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
N/A
(5) Findings were made pursuant to the provisions of CEQA
Yes