Berry Street Bridge Replacement Project

4 Documents in Project

Summary

SCH Number
2015052056
Lead Agency
City of Calistoga
Document Title
Berry Street Bridge Replacement Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Various
Document Description
The Berry Street Bridge Replacement Project includes replacing the existing Berry Street Bridge that crosses the Napa River, widening the bridge approaches, and realign the intersection of Berry Street and Washington Street. The Proposed Project includes the construction of an approximately 80-foot long and 55-foot wide single-span bridge. New abutments would also be installed farther up the channel bank to improve the hydraulic conveyance capacity at the bridge site. The intersection improvements include 93 feet to the west and 80 feet to the east on Washington Street. Berry Street will have a light horizontal curve through the bridge, which will shorten the bridge span. This alignment will require a small right-of-way acquisition from the City owned parcel at the southeast corner of the Berry Street/Washington Street intersection.

Contact Information

Name
Derek Rayner
Agency Name
City of Calistoga
Contact Types
Lead/Public Agency

Location

Cities
Calistoga
Counties
Napa
Cross Streets
Berry Street and Washington Street
Zip
94515
State Highways
Hwy 29
Schools
Calistoga ES/JSH
Waterways
Napa River

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Parks and Recreation, California Department of State Parks, Division of Boating and Waterways, California Department of Transportation, District 4 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), Department of Water Resources, Office of Historic Preservation, Resources Agency
Development Types
Transportation:Other (Bridge Replacement)
Local Actions
Bridge Replacement
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print