Alhambra Valley Road Safety Improvements Project (at Rancho La Boca Road and Ferndale Road) (Streambed Alteration Agreement NO. 1600-2016-0087-R3)

3 Documents in Project

Summary

SCH Number
2015052041
Lead Agency
Contra Costa County
Document Title
Alhambra Valley Road Safety Improvements Project (at Rancho La Boca Road and Ferndale Road) (Streambed Alteration Agreement NO. 1600-2016-0087-R3)
Document Type
NOD - Notice of Determination
Received

Document Description
The CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0087-R3, pursuant to section 1602 of the Fish and Game Code to the Contra Costa County Public Works Dept. as represented by Mr. Steve Kowalewski. Project is limited to pavement widening along 1,000 linear feet of Alhambra Valley Road that will consist of four foot wide paved shoulders on both sides of the road. The Project will result in the removal of two-native, non-riparian cottonwoods as well as the removal of 2,200 cubic yards of soil that will be hauled off site. Approx. 200 cubic yards of soil shall remain on-site and be used to fill vertical areas along the road. The Project will also result in the widening of Alhambra Valley Road along 360 linear feet. The widening will include an increase of four feet on both sides of the road for the installation of paved shoulders. The existing culvert at this location shall be replaced with a 86 foot long, 42 inch diameter corrugated metal pipe reinforced with concrete.

Contact Information
Melissa Farinha
CDFW
7329 Silverado Trail
Napa, CA 94559

707-944-5579

Location

Coordinates
37°58'7"N 122°10'35"W
Cities
Martinez
Counties
Contra Costa
Cross Streets
Rancho La Boca Road and Ferndale Road
Zip
94553
Total Acres
1.6
Waterways
Unnamed tributary to Alhambra Del Hambre
Township
2N
Range
3W
Section
34
Base
MDB&M

Notice of Determination

Approving Agency
Contra Costa County
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
7329 Silverado Trail, Napa, CA 94559

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No