Routine Maintenance of Levees and Channels (Environmental Permitting for Operation and Maintenance (EPOM)) Project (Lake or Streambed Alteration Agreement No. 1

20 Documents in Project

Summary

SCH Number
2015052035
Lead Agency
California Department of Water Resources (DWR)
Document Title
Routine Maintenance of Levees and Channels (Environmental Permitting for Operation and Maintenance (EPOM)) Project (Lake or Streambed Alteration Agreement No. 1
Document Type
NOD - Notice of Determination
Received
Posted
12/31/2018
Document Description
CDFW has executed Lake and Streambed Alteration Agreement number 1600-2017-0269-R3, pursuant to section 1602 of the Fish and Game Code to the project applicant, California Department of Water Resources. The applicant is proposing to maintain levees and channels for flood maintenance purposes. This includes waterside levee maintenance (e.g. rodent damage repair, vegetation management, erosion, repair, waterside levee access road maintenance, channel maintenance (e.g. sediment removal, debris/obstruction removal, vegetation management, toe drain repair, and channel and bank scour repair), flood control structure maintenance and repair (e.g. weirs and pipe/culvert maintenance, repair, removal/replacement, and abandonment in place), geotechnical borings, dewatering, and vegetation plantings.

Contact Information

Name
Andrea Boertien
Agency Name
CDFW, Bay Delta Region
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento, Solano, Yolo
Waterways
Sacramento River, Putah Creek, Yolo Bypass levees

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print