2023 Storm Damage Emergency Repair Project (California Endangered Species Act Incidental Take Permit No. 2081-2023-058-02 (ITP))

20 Documents in Project

Summary

SCH Number
2015052035
Lead Agency
California Department of Water Resources (DWR)
Document Title
2023 Storm Damage Emergency Repair Project (California Endangered Species Act Incidental Take Permit No. 2081-2023-058-02 (ITP))
Document Type
NOD - Notice of Determination
Received
Posted
12/20/2023
Document Description
This proposed project involves placement and compaction of a soil and rock mixture within each erosion repair site and revetment placement along the bottom of each site for added levee stability. Site 23-032 also includes culvert installation in an irrigation ditch at the landside levee toe. The Project will result in permanent impacts to 0.24 acres of Giant garter snake (Thamnophis gigas) habitat. The project is expected to result in incidental take of Giant garter snake, which are designated as a threatened species under the California Endangered Species Act. The ITP referenced above as issued by CDFW authorizes incidental take of species listed under CESA that may occur as a result of Project implementation.

Contact Information

Name
Annalise Metzger
Agency Name
California Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
Butte, Colusa
Regions
Northern California
Other Location Info
Site 23-030 is located on the landside left bank of Colusa Drain. Sites 23-031 and 23-032 are located on the landside left bank of Cherokee Canal.

Notice of Determination

Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerks
Butte, Colusa
Final Environmental Document Available at
CDFW's regional office

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print