Jail Replacement Project

2 Documents in Project

Summary

SCH Number
2015052022
Lead Agency
Santa Clara County
Document Title
Jail Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
1/26/2018
Document Description
The project, which was previously approved by the Santa Clara County Board of Supervisors on a MND, has been modified to move the site of the replacement jail to the location of the current South Main Jail, reduce the size of the building to 243,000 sq. ft., and reduce the inmate capacity to 535. An addendum to the previously adopted MND was prepared to determine if it would require subsequent or supplemental environmental review per the conditions described in Section 15162 of the CEQA Guidelines. The modified project would not result in new significant environmental effects or a substantial increase in the severity of previously identified significant effects, either because of the project modifications or with respect to the circumstances under which the project would be undertaken. Impact determinations remain the same, and mitigation measures identified to reduce significant impacts to a less-than-significant level would be reapplied to the modified project.

Contact Information

Name
David Rader
Agency Name
Santa Clara County
Contact Types
Lead/Public Agency

Location

Cities
San Jose
Counties
Santa Clara
Cross Streets
W. Hedding and N. San Pedro Streets
Zip
95110
Parcel #
259-04-011 / -015 / -020
State Highways
Highway 87
Airports
San Jose Int'l
Waterways
Guadalupe River

Notice of Determination

Approving Agency
Santa Clara County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.