Jail Replacement Project
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2015052022
- Lead Agency
- Santa Clara County
- Document Title
- Jail Replacement Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 1/26/2018
- Document Description
- The project, which was previously approved by the Santa Clara County Board of Supervisors on a MND, has been modified to move the site of the replacement jail to the location of the current South Main Jail, reduce the size of the building to 243,000 sq. ft., and reduce the inmate capacity to 535. An addendum to the previously adopted MND was prepared to determine if it would require subsequent or supplemental environmental review per the conditions described in Section 15162 of the CEQA Guidelines. The modified project would not result in new significant environmental effects or a substantial increase in the severity of previously identified significant effects, either because of the project modifications or with respect to the circumstances under which the project would be undertaken. Impact determinations remain the same, and mitigation measures identified to reduce significant impacts to a less-than-significant level would be reapplied to the modified project.
- Contact Information
-
David Rader
Santa Clara County
Lead/Public Agency
70 W. Hedding Street 7th Floor, East Wing
San Jose, CA 95110
Phone : (408) 299-5779
Location
- Cities
- San Jose
- Counties
- Santa Clara
- Cross Streets
- W. Hedding and N. San Pedro Streets
- Zip
- 95110
- Parcel #
- 259-04-011 / -015 / -020
- State Highways
- Highway 87
- Airports
- San Jose Int'l
- Waterways
- Guadalupe River
Notice of Determination
- Approving Agency
- Santa Clara County Board of Supervisors
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 70 West Hedding St., San Jose, CA 95110
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- N/A
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- N/A
- (6) Findings were made pursuant to the provisions of CEQA
- N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.