Riverside Drive Pedestrian and Bike Trail project

2 Documents in Project

Summary

SCH Number
2015052003
Lead Agency
Susanville, City of (City of Susanville)
Document Title
Riverside Drive Pedestrian and Bike Trail project
Document Type
NOD - Notice of Determination
Received
Posted
7/1/2015
Present Land Use
Abandoned Mill site / M1 / M2 Light and Heavy Industrial Zone / Heavy and Light Industrial land use designation

Document Description
Proposal to construct a 0.36 mile Class 1 pedestrian and bike trail extension along the south side of Riverside Drive. The trail includes a 298 foot pedestrian bridge crossing of the Susan River. The trail alignment will utilize an existing abandoned gravel maintenance road. The project will enhance the pedestrian and bike trail network within the urban area.

Contact Information
Dan Newton
City of Susanville
720 South Street
Susanville, CA 96130

Phone : (530) 257-1941

Location

Coordinates
40°24'43"N 120°39'0"W
Cities
Susanville
Counties
Lassen
Cross Streets
Riverside Drive between Riverside Park and Riverside Trail
Zip
96130
Total Acres
2.3
Parcel #
107-280-09/10, 105-302-14/15/16
State Highways
Hwy 36 and 139
Schools
Lassen Union HS/Meadow
Waterways
Susan River
Township
30
Range
12E
Section
32

Notice of Determination

Approving Agency
City Council of Susanville
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
City of Susanville, 66 N. Lassen Street, Susanville, CA

Determinations

(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search