Interim Measures Work Plan, Area of Concern Former Power Block Units 1-2, Western Rock Blotter Area, Moss Landing Power Plant
3 Documents in Project
Summary
SCH Number
2015051041
Lead Agency
California Department of Toxic Substances Control
(DTSC)
Document Title
Interim Measures Work Plan, Area of Concern Former Power Block Units 1-2, Western Rock Blotter Area, Moss Landing Power Plant
Document Type
NOD - Notice of Determination
Received
Posted
7/6/2015
Present Land Use
Heavy Industrial
Document Description
The DTSC is proposing to approve the Interim Measure (IM) Workplan for the Former Block Units 1-2, Western Rock Blotter Area in Area of Concern (AOC) Power Block 1-5 for, at Moss Landing Power Plant (MLPP) formerly owned by Pacific Gas and Electric Company (PG&E) in Moss Landing, Environmental Protection Agency identification number CAT080011653. The IM Workplan includes characterization procedures to be used in investigating and proposed excavation of impacted soil beneath a former row of transformers in the western part of the Rock Blotter Area at Power Block Units 1-2 at the MLPP. This Workplan was prepared and submitted by Arcadis U.S., Inc. on behalf of PG&E and it is incorporated by reference. A Workplan for removal of soil was previously approved by DTSC in 2009, and covered the same general Rock Blotter Area at Power Blocks 1-5, but removed soil from eastern Power Block Units 3-5.
Contact Information
Name
John Bystra
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Monterey
Cross Streets
Dolar Road
Zip
95039
Total Acres
243.28
Parcel #
133-181-011 and 133-171-033
State Highways
Hwy 1
Railways
No
Airports
No
Schools
no
Waterways
Elkhorn and Moro Cojo Slough, Moss Landing Harbor
Township
13S
Range
2E
Section
17/18
Other Location Info
Moss Landing
Notice of Determination
Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.