Offsite Interim Remedial Measures Work Plan Addendum for Cherry Aerospace

3 Documents in Project

Summary

SCH Number
2015051026
Lead Agency
Department of Toxic Substances Control
Document Title
Offsite Interim Remedial Measures Work Plan Addendum for Cherry Aerospace
Document Type
NOD - Notice of Determination
Received
Posted
6/26/2018
Present Land Use
light industrial use
Document Description
On June 30, 2015, DTSC approved the IRMWP which proposed to control or abate threats to human health and/or the environment, and to prevent or minimize the spread of chemicals of potential concern (COPCs) in this case, volatile organic compounds (VOCs) and 1,4-dixoane - while long-term corrective action alternatives are being evaluated. The 2015 Interim Remedial Work Plan (IRMWP) proposed to install ten groundwater extraction wells aboveground conveyance piping, and an above ground treatment plant to treat extracted groundwater within the Site's boundary. While the onsite Interim remedial measure (IRMs) are expected to effectively address onsite sources and reduce migration of COPCs into the offsite area, additional actiosn were deemed necessary to address VOC-impacted groundwater, which has already migrated offsite to the south and southwest of the Site. Therefore, the Offsite IRMWP Addendum was prepared to minimize further migration of VOCs from the Site (to the extent possible) and reduce concentrations of Cherry Aerospace Facility-related VOCs in offsite groundwater to the south and southwest of the site.

Contact Information

Name
Chia Rin Yen
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
Santa Ana
Counties
Orange
Cross Streets
S. Evergreen Street
Zip
92705
Total Acres
15.5
Parcel #
016-150-009
State Highways
Hwy 405
Railways
SPRR
Township
5
Range
9
Section
30
Base
15.58

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.