Cota Street Bridge Replacement Project

Summary

SCH Number
2015049004
Lead Agency
City of Santa Barbara
Document Title
Cota Street Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
4/8/2015
Document Description
CDFW is intending to execute a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code (# 1600-2014-0255-R5) to the Project applicant, Tim Gaasch, City of Santa Barbara Public Works. The Project proposes to replace a structurally deficient existing 60-foot long by 26-foot wide vehicle bridge with a 56-foot long by 37-foot wide span bridge. The existing bridge is too narrow to accommodate increased channel width that will occur with the Lower Mission Creek Flood Control Project (LMCFCP) which is currently in construction. The MLCFCP is widening the entire lower portion of the channel to accommodate a 25-year event. The new bridge will consist of cast-in-steel shells which support reinforced concrete pile caps, which in turn support the bridge abutments, supporting the bridge deck. The piles require piling driving, the abutment and the wing-walls will be cast-in-place, the deck will be pre-cast, and the utility lines will be relocated. There will be wing-walls to connect the natural banks. The channel bottom is natural at this location, with natural banks upstream and the downstream east bank. The bottom of the channel shall remain a natural substrate or replaced with engineered streambed material, which is suitable for fish migration. Water diversion consists of two upstream coffer dams, with two 24-inch PVC pipes allowing water to flow past the Project site and back into the channel. No surface flows shall be diverted using a pump. This bridge is located within an urban residential area.

Contact Information

Name
Natasha Lohmus
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Santa Barbara
Counties
Santa Barbara

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.