Truckee High School Track and Field Improvements

3 Documents in Project

Summary

SCH Number
2015042079
Lead Agency
Tahoe Truckee Unified School District
Document Title
Truckee High School Track and Field Improvements
Document Type
NOD - Notice of Determination
Received
Posted
6/25/2015
Present Land Use
Existing land use - Truckee High School athletic facilities, circulation, and parking; Z: Public Facilities GP: Public
Document Description
The project includes converting the existing cinder track at the Truckee High School (THS) to an all-weather track. Improvements include constructing an Americans with Disabilities Act - compliant path of travel between THS, the existing track, Sierra High School, and the public right of way; installing one restroom facility; installing new bleachers to accommodate 200 seats; installing new permanent speakers and infrastructure for a portable public address system (to connect to permanent speakers) and timing system; and completing parking lot improvements to include repaving, restriping, and installing new LED parking lot lighting, providing approximately 109 parking spaces.

Contact Information

Name
Rob Koster
Agency Name
Tahoe Truckee Unified School District
Contact Types
Lead/Public Agency

Location

Cities
Truckee
Counties
Nevada
Cross Streets
Donner Pass Road between Northwood Blvd and SR 89
Zip
96161
Parcel #
18-570-03-000; 18-570-22-000
State Highways
I-80, SR 89
Railways
UPRR
Schools
Truckee HS
Waterways
Truckee River

Notice of Determination

Approving Agency
Tahoe-Truckee Unified School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print