French Bar Road at South Fork Jackson Creek Bridge Replacement Project

5 Documents in Project

Summary

SCH Number
2015042036
Lead Agency
City of Jackson
Document Title
French Bar Road at South Fork Jackson Creek Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
1/23/2017
Present Land Use
Placer County right-of-way; Residential Single Family, Residential, Commercial
Document Description
The city of Jackson will remove and replace the French Bar Road Bridge with a 40 foot long cast-in-place single span structure, accomplish sediment and debris removal to restore the creek to its approximate original geometry, and install of a sanitary sewer line encased in approx. 70 feet of concrete across the stream bed. The new bridge abutments will be realigned to provide improved hydraulic capacity through the project area. Rock Slope Protection will be placed on a portion of the embankment underneath the bridge and Bio-engineered bank protection will be placed on the remainder of the creek banks.

Contact Information

Name
Stephanie Tadlock
Agency Name
Central Valley Regional Water Board
Contact Types
Lead/Public Agency

Location

Cities
Jackson
Counties
Amador
Cross Streets
State Highway 49
Total Acres
1.697
Parcel #
Various
State Highways
State Hwy 49 & 88
Schools
Jackson ES
Waterways
S. Fork Jackson Creek, Jackson Creek, Jackass Gulch
Township
6N
Range
11E
Section
28
Base
MDB&M

Notice of Determination

Approving Agency
Central Valley Regional WAter Quality Control Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.