Site 18A Culvert Replacement and Fish Passage Enhancement Project
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2015042009
- Lead Agency
- Sacramento Area Flood Control Agency
- Document Title
- Site 18A Culvert Replacement and Fish Passage Enhancement Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 10/2/2015
- Present Land Use
- American River Parkway - Floodplain Zone / Recreation / Waterway
- Document Description
- To replace a culvert; place rip rap; reconstruct a portion of the American River bike trail; regrade riparian basin and re-vegetate with native grasses; and plant replacement trees and shrubs.
- Contact Information
-
James Herota
Central Valley Flood Protection Bd
Lead/Public Agency
3310 El Camino Avenue Rm 151
Sacramento, CA 95821
Phone : (916) 574-0651
Location
- Coordinates
- 38°36'7.02"N 121°28'26.68"W
- Cities
- Sacramento
- Counties
- Sacramento
- Cross Streets
- Northgate Blvd / Del Paso Blvd
- Zip
- 95815
- Total Acres
- 14
- Parcel #
- 274-0190-009, 020, 022, 035
- State Highways
- Hwy 160
- Railways
- UPRR
- Schools
- Twin Rivers / No. Sac / Sac
- Waterways
- NEMDC / Steelhead Creek, American River
- Township
- 9N
- Range
- 5E
- Section
- 30
- Base
- MDB&M
- Other Location Info
- Natomas
Notice of Determination
- Approving Agency
- Central Valley Flood Protection Bd
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 3310 El Camino Avenue Rm 151, Sacramento, CA 95821
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- N/A
- (6) Findings were made pursuant to the provisions of CEQA
- N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.