Site 18A Culvert Replacement and Fish Passage Enhancement Project

5 Documents in Project

Summary

SCH Number
2015042009
Lead Agency
Sacramento Area Flood Control Agency
Document Title
Site 18A Culvert Replacement and Fish Passage Enhancement Project
Document Type
NOD - Notice of Determination
Received
Posted
5/22/2015
Present Land Use
American River Parkway - Floodplain Zone / Recreation / Waterway
Document Description
SAFCA proposes to reduce the potential for fish stranding, further reduce predation by fish-eating (piscivorous) birds, and increase rearing and feeding habitat for juvenile salmonids at Site 18A, a seasonal wetland complex in the American River Parkway adjacent to the Natomas East Main Drainage Canal (NEMDC)/Steelhead Creek. The proposed project would involve replacing the existing culvert with a larger, wider culvert to improve the exchange of flows into and out of Site 18A, and modifying the gradient of the interior swales and increasing the extent of seasonally submerged vegetation and overhead cover within the Site 18A floodplain.

Contact Information

Name
John A. Bassett
Agency Name
Sacramento Area Flood Control Agency
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Cross Streets
Northgate Blvd / Del Paso Blvd
Zip
95815
Total Acres
14
Parcel #
274-0190-009, 020, 022, 035
State Highways
Hwy 160
Railways
UPRR
Schools
Twin Rivers / No. Sac / Sac
Waterways
NEMDC / Steelhead Creek, American River
Township
9N
Range
5E
Section
30
Base
MDB&M
Other Location Info
Natomas

Notice of Determination

Approving Agency
Sacramento Area Flood Control Agency
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No