San Lorenzo River Lagoon Interim Management Program
9 Documents in Project
Summary
SCH Number
2015042002
Lead Agency
City of Santa Cruz
Document Title
San Lorenzo River Lagoon Interim Management Program
Document Type
NOD - Notice of Determination
Received
Posted
6/17/2015
Present Land Use
San Lorenzo River Mouth at Monterey Bay / Floodplain & Oceanfront Recreation Districts/Natural Area & Coastal Recreation
Document Description
The San Lorenzo River Lagoon Interim Management Program (IMP) focuses on prevention of unauthorized river lagoon breaching affecting listed aquatic species and control of water elevation of the lagoon at elevation 5.0 feet NGVD to prevent localized flooding to public and private properties and infrastructure. The IMP is designed as an adaptive management program for addressing activities related to fisheries habitat, flooding, and public access and safety where the river mouth empties at Santa Cruz Main Beach. The IMP includes two management activities to be implemented during the proposed three-year management period of 2015 through 2017 between May 1 and November 15, which include installation of: 1) a Temporary Outlet Channel that would be implemented in 2015 and 2016; and 2) a Head Drive Culvert that would be implemented in 2016 (if funding is secured) and in 2017. Implementation of Best Management Practices and monitoring actions will be conducted as part of the project.
Contact Information
Name
Scott Collins
Agency Name
City of Santa Cruz
Contact Types
Lead/Public Agency
Phone
Location
Cities
Santa Cruz
Counties
Santa Cruz
Cross Streets
East Cliff Drive
Parcel #
007-321-04, -07, -09, 007-291-01
State Highways
Hwy 1
Railways
Local - SCCRTC
Waterways
San Lorenzo River and Monterey Bay
Notice of Determination
Approving Agency
City of Santa Cruz
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.