Westside Gateway Project

2 Documents in Project

Summary

SCH Number
2015041036
Lead Agency
City of Costa Mesa
Document Title
Westside Gateway Project
Document Type
NOD - Notice of Determination
Received
Posted
5/13/2015
Present Land Use
GPLUD: Light Industry Z: General Industrial
Document Description
The project applicant (W-WP Westside Gateway Owner VII, LLC) is seeking approval of a Master Plan, Vesting Tentative Tract Map, and deviations from the Mesa West Bluffs Urban Plan development standards to redevelop the nine-acre project site with a mix of residential lofts and live/work units. The project as proposed requires discretionary approval per the Mesa West Bluffs Urban Plan. In order to redevelop the project site, all existing buildings, structures, parking areas, drive aisles, and hardscape improvements would be demolished, and a number of mature ornamental trees and other landscape improvements throughout the site would be removed. Site redevelopment may also require soil remediation due to past and present light industrial and manufacturing uses, as well as utility infrastructure improvements along the northern and western site boundaries. Once the project site is cleared and graded and all soil remediation is completed, the project applicant would redevelop the project site with the Westside Gateway Project. Under the Westside Gateway Project, the project site would be developed with up to 177 dwelling units, which would include a mix of three product types to create a sense of variation and a series of different neighborhood types, as follows: -An attached live/work product totaling 89 units. -A detached live/work product totaling 42 units. -An attached residential loft product totaling 46 units. Other project components include landscaping, open space, and recreation improvements; access, circulation, and parking improvements; infrastructure improvements; and sustainability measures. All of the internal private streets and drive aisles, common open space and recreation areas and facilities, courtyards, and streetscapes within the project site boundaries would be owned and maintained by a future homeowners association. The streetscape along the Pomona Avenue and 17th Street right-of-way would be owned and maintained by the City.

Contact Information

Name
Minoo Ashabi
Agency Name
City of Costa Mesa
Contact Types
Lead/Public Agency

Location

Cities
Costa Mesa
Counties
Orange
Cross Streets
17th Street and Pomona Avenue
Zip
92627
Total Acres
9
Parcel #
424-291-11
State Highways
SR 55
Railways
No
Airports
No
Schools
Various
Waterways
Santa Ana River, Newport Bay
Township
6S
Range
10W
Section
21

Notice of Determination

Approving Agency
City of Costa Mesa
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print