Glorietta Bay Marina Dock C and Boat Launch Facility Improvements

5 Documents in Project

Summary

SCH Number
2015041025
Lead Agency
City of Coronado
Document Title
Glorietta Bay Marina Dock C and Boat Launch Facility Improvements
Document Type
NOD - Notice of Determination
Received
Posted
6/3/2015
Present Land Use
Marina: Civic Use (CU) and Open Space (OS): Civic Use/Open Space
Document Description
The project consists of improvements to Dock C and the boat launch facility. The Dock C improvements would include the redevelopment, reconfiguration, and extension of the existing dock system in order to meet current fire and electrical code requirements, as well as ADA and boating design standards. The redeveloped dock system would remain within the pierhead line. The boat launch facility improvements consist of replacing the concrete apron of the boat launch ramp, maintaining the adjacent revetment, replacing and expanding the uses of the adjoining boarding dock with a free public dock, creating a nonmotorized craft launch area on a new sandy beach, resurfacing the parking lot, installing a new boat wash-down area, and repairing a small area of riprap and existing storm drain in the northern beach area of Glorietta Bay Park.

Contact Information

Name
Jerome Torres
Agency Name
City of Coronado
Contact Types
Lead/Public Agency

Location

Cities
Coronado
Counties
San Diego
Cross Streets
Silver Strand Way and Avenue de las Arenas
Zip
92118
Parcel #
None
State Highways
Hwy 75, 282
Railways
No
Airports
North Island NAS
Schools
Various
Waterways
Glorietta Bay, San Diego Bay, Pacific Ocean
Township
17S
Range
3W
Section
22

Notice of Determination

Approving Agency
City of Coronado
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print