State Route 119-43-Enos Lane Intersection Improvement Project (Major Amendment No. 1, California Endangered Species Act Incidental Take Permit No. 2081-2018-051

5 Documents in Project

Summary

SCH Number
2015041023
Lead Agency
Caltrans 6 (Fresno) (California Department of Transportation, District 6)
Document Title
State Route 119-43-Enos Lane Intersection Improvement Project (Major Amendment No. 1, California Endangered Species Act Incidental Take Permit No. 2081-2018-051
Document Type
NOD - Notice of Determination
Received

Document Description
-04(ITP)) The Project is being implemented to improve the continuity, safety, and capacity of the 0.7-mile segment of State Route 119 between post mile 17.8 and post mile 18.5; and the 0.6-mile segment of State Route 43/Enos Lane between post mile 0.5 and a point 0.2 mile south of the intersection. The Project involves: demolition of the existing conventional intersection at State Route (SR) 119 and SR 43/Enos Lane and the construction of curved "chicane" approach lanes to a new roundabout traffic circle intersection. *See NOD for full details.

Contact Information
Javier Mendez
CDFW
1234 East Shaw Avenue
Fresno, CA 93710

559.243.4014 x 288

Location

Counties
Kern
Cross Streets
Intersection at State Route 119 and State Route 43/ Enos Lane
Other Location Info
The 7.5-acre Project Area is located within Sections 35 of Township 31 South, Range 25 East, Mount Diablo Baseline and Meridian (MDB&M), Section 36 of Township 30 South, Range 25 East, MDB&M, Section 1 of Township 31 South, Range 25 East, MDB&M, and Section 2 a/Township 31 South, Range 25 East, MDB&M.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
1234 East Shaw Avenue Fresno, CA 93710

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
NOD   PDF 163 K
Download CSV New Search