65th Street Hampton Inn & Suites (DR14-257)

2 Documents in Project

Summary

SCH Number
2015032065
Lead Agency
City of Sacramento
Document Title
65th Street Hampton Inn & Suites (DR14-257)
Document Type
NOD - Notice of Determination
Received
Posted
7/8/2015
Present Land Use
Vacant and partially paved Z: General Commercial with a Transit Overlay GPD: Urban Center Low
Document Description
The project consists of the development of two four-story hotel buildings with a maximum of 216 hotel rooms and one retail building. In addition, a new light rail crossing and curb ramp would be constructed near the existing Sacramento RT corridor to allow pedestrian transportation across the RT path located east of 65th Street and south of Q Street. Furthermore, platform improvements at the Sacramento RT District station may occur concurrently with project development. Construction of the proposed project would occur in two phases, beginning with the Hampton Inn & Suites development proposed on the east side of the project area. The second phase would include the second hotel building, the retail building, and a portion of the Sacramento RT District station improvements.

Contact Information

Name
Scott Johnson
Agency Name
City of Sacramento
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Cross Streets
US Hwy 50 & 65th Street
Zip
95817
Total Acres
5.14
Parcel #
015-0010-037 and 015-0010-038
State Highways
US Hwy 50
Railways
UPRR, Sac Regional Transit Corri
Schools
Hiram Johnson HS, CSUS, Phoebe Hurst ES, Tahoe ES
Waterways
Alder Creek and Carson Creek
Township
8N
Range
5E
Section
9
Base
MDB&M

Notice of Determination

Approving Agency
City of Sacramento
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print