Leisure Lane Storm Drain Improvement Project (Lake ro Streambed Alteration Agreement No. 1600-2017-0200-R2)
4 Documents in Project
Summary
SCH Number
2015032059
Lead Agency
City of Sacramento
Document Title
Leisure Lane Storm Drain Improvement Project (Lake ro Streambed Alteration Agreement No. 1600-2017-0200-R2)
Document Type
NOD - Notice of Determination
Received
Posted
8/2/2017
Present Land Use
Detention basin/storm drain facilities / C-2-LI and No Zoning / Urban Ctr Low / Suburban
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0200-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, City of Sacramento.
Project consists of constructing a new outlet weir box, approx. 9 feet by 29 feet, north of CA-Hwy 160 between the Permitee's existing 8-inch waterline and 12-inch sewer line. To build the new outlet weir box, the existing 3-foot by 4-foot box culvert, the 60 inch diameter pipe, and the 34-inch diameter pipe will be extended. The outlet weir box will have a 12-inch diameter pipe at grade that will allow all collected storm water that will eventually draining out of the Basin over several days.
South of CA-Hwy 160, a transition manhole will be constructed wherein the flow shape will change from rectangular to round, followed by placement of approx. 145 feet of either 54-inch diameter Reinforced Concrete Pipe (RCP) or 6-inch diameter plastic pipe buried at-grade within the existing ditch. The buried pipe will terminate with a standard flared end section, with concreted cobbled riprap around it (similar to what exists now around the existing 60-inch and 34-inch outlets to mitigate erosion.
Contact Information
Name
Tanya Sheya
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Cities
Sacramento
Counties
Sacramento
Cross Streets
Royal Oaks Drive / Hwy 160 and Leisure Lane / Exposition Blvd / Hwy 160
Zip
95815
Total Acres
0.315
Parcel #
275-0240-097-0000
State Highways
Hwy 160
Railways
UPRR
Schools
Woodlake ES
Waterways
American River
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.