Leisure Lane Storm Drain Improvements Project

4 Documents in Project

Summary

SCH Number
2015032059
Lead Agency
City of Sacramento
Document Title
Leisure Lane Storm Drain Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
6/24/2015
Present Land Use
Detention basin/storm drain facilities / C-2-LI and No Zoning / Urban Ctr Low / Suburban
Document Description
The project consists of constructing a new approximately 10 ft. x 30 ft. outlet weir box north of CA-Hwy 160 between the City's existing 8 inch waterline and 12 inch sewer line in the City's Basin. To build the new outlet weir box, the existing 3 foot by 4 foot box culvert, the 60 inch diameter pipe, and the 34 inch diameter pipe will be extended. The outlet weir box will have a 12 inch diameter pipe at grade that will allow all collected storm water to eventually drain out of the Basin over several days. South of CA-Hwy 160, a transition manhole will be constructed wherein the flow shape will change from rectangular to round, followed by placement of approximately 145 feet of either 54 inch diameter Reinforced Concrete Pipe (RCP) or 60 inch diameter plastic pipe buried at-grade within the existing ditch. The buried pipe will terminate with a standard flared end section, with concreted cobble rip-rap.

Contact Information

Name
Scott Johnson
Agency Name
City of Sacramento
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Cross Streets
Royal Oaks Drive / Hwy 160 and Leisure Lane / Exposition Blvd / Hwy 160
Zip
95815
Total Acres
0.315
Parcel #
275-0240-097-0000
State Highways
Hwy 160
Railways
UPRR
Schools
Woodlake ES
Waterways
American River

Notice of Determination

Approving Agency
City of Sacramento
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes