Saratoga Estates (Lake or Streambed Alteration Agreement No. 1600-2017-0375-R2)
8 Documents in Project
Summary
SCH Number
2015032058
Lead Agency
El Dorado County
Document Title
Saratoga Estates (Lake or Streambed Alteration Agreement No. 1600-2017-0375-R2)
Document Type
NOD - Notice of Determination
Received
Posted
7/18/2018
Present Land Use
Undeveloped/R1 (Single-unit Residential) and OS (open space)/High Density Residential (HDR)
Document Description
CDFW has issued a Major Amendment to Streambed Alteration Agreement No. 1600-2017-0375-R2 (Saratoga Estates Project).
The Major Amendment authorizes the construction of a 140-foot long 48-inch reinforced concrete pipe culvert crossing in the northernmost stream crossing area instead of the ConSpan bridge described in the original Agreement. An approx. 200 sq. ft. area of rip rap will be placed at the downstream end of the culvert pipe, and approx. 100 cubic yards of clean fill and earthen materials will be placed on the top and sides of the culvert to form the road crossing.
Construction of the culvert crossing will permanently impact 0.063 acre of perennial streambed and 0.023 acre of riparian habitat.
Contact Information
Name
Gabriele Quillman
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Counties
El Dorado
Cross Streets
Between Saratoga Way in El Dorado Hills
Zip
95762
Total Acres
121
Parcel #
120-070-02
State Highways
I-5
Schools
6
Township
9N
Range
8E
Section
2,10,
Other Location Info
El Dorado Hills
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes