Pinecrest Lake Level Modification Project (Project)
2 Documents in Project
Download CSV
Download All Attachments
New Search
Print
Summary
- SCH Number
- 2015032047
- Lead Agency
- State Water Resources Control Board
- Document Title
- Pinecrest Lake Level Modification Project (Project)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 8/7/2020
- Document Description
- Pacific Gas and Electric Company (PG&E) filed a request with the State Water Resources Control Board (State Water Board) to modify the existing Clean Water Act Section 401 water quality certification (certification) for PG&E's Spring Gap-Stanislaus Hydroelectric Project. The request was to modify Condition 4 that pertains to the minimum Labor Day Pinecrest Lake level. Pinecrest Lake is located on the South Fork Stanislaus River in Tuolumne County, California. Other activities included with the Project include: rock and stump removal to reduce boating hazards, substrate improvements to improve beach areas, swimming buoy line modification to increase swimming area, and public notification requirements to inform the public of lake level conditions.
- Contact Information
-
Allan Laca
State Water Resources Control Board
Lead/Public Agency
1001 I Street
Sacramento, CA 95814
Phone : (916) 322-8469
-
Pacific Gas and Electric Company
Project Applicant
Location
- Counties
- Tuolumne
- Waterways
- Pinecrest Lake
Notice of Determination
- Approving Agency
- State Water Resources Control Board
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- State Water Board Offices - 1001 I Street, Sacramento, California
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Attachments
- Final Document(s)
- ISMND Final PDF 9870 K
- Notice of Determination
- 2015032047_Pinecrest Lake PDF 1325 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.