State Route 1 Lagunitas Creek Bridge Project
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2015032036
- Lead Agency
- Caltrans 4 (Oakland) (California Department of Transportation, District 4)
- Document Title
- State Route 1 Lagunitas Creek Bridge Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/3/2018
- Present Land Use
- land use in the vicinity are designated as open space, ag, low density or rural res, and commercial
- Document Description
- Caltrans proposes to replace the bridge crossing Lagunitas Creek on SR 1. The bridge is located at PM 28.5, south of the unincorporated town of Point Reyes and north of the "T" intersection of SR 1 with Sir Francis Drake Blvd. Five Build Alternatives and one No-Build Alternative were analyzed in the EIR/EA. The preferred alternative is Alternative 3a, Three-span, concrete bridge. Under this alternative, construction would occur over 1 year, with most construction activities occurring in 5 months. The purpose of the project is to provide a safe, seismically stable crossing of Lagunitas Creek.
- Contact Information
-
Eric DeNardo
California Department of Transportation, District 4
111 Grand Avenue
Oakland, CA 94612
Phone : (510) 286-5645
Location
- Coordinates
- 38°3'54"N 122°48'17.8"W
- Counties
- Marin
- Cross Streets
- SR 1 and Sir Francis Drake Blvd
- Zip
- 94956
- Total Acres
- 2.50-2.81
- State Highways
- Hwy 1
- Schools
- W. Marin ES
- Waterways
- Laguntis Creek
- Other Location Info
- Point Reyes Station
Notice of Determination
- Approving Agency
- Caltrans #4
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 111 Grand Ave., MS-8B, Oakland, CA 94612
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.