State Route 1 Lagunitas Creek Bridge Project

5 Documents in Project

Summary

SCH Number
2015032036
Lead Agency
Caltrans 4 (Oakland) (California Department of Transportation, District 4)
Document Title
State Route 1 Lagunitas Creek Bridge Project
Document Type
NOD - Notice of Determination
Received
Posted
7/3/2018
Present Land Use
land use in the vicinity are designated as open space, ag, low density or rural res, and commercial

Document Description
Caltrans proposes to replace the bridge crossing Lagunitas Creek on SR 1. The bridge is located at PM 28.5, south of the unincorporated town of Point Reyes and north of the "T" intersection of SR 1 with Sir Francis Drake Blvd. Five Build Alternatives and one No-Build Alternative were analyzed in the EIR/EA. The preferred alternative is Alternative 3a, Three-span, concrete bridge. Under this alternative, construction would occur over 1 year, with most construction activities occurring in 5 months. The purpose of the project is to provide a safe, seismically stable crossing of Lagunitas Creek.

Contact Information
Eric DeNardo
California Department of Transportation, District 4
111 Grand Avenue
Oakland, CA 94612

Phone : (510) 286-5645

Location

Coordinates
38°3'54"N 122°48'17.8"W
Counties
Marin
Cross Streets
SR 1 and Sir Francis Drake Blvd
Zip
94956
Total Acres
2.50-2.81
State Highways
Hwy 1
Schools
W. Marin ES
Waterways
Laguntis Creek
Other Location Info
Point Reyes Station

Notice of Determination

Approving Agency
Caltrans #4
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
111 Grand Ave., MS-8B, Oakland, CA 94612

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search