Great Meadow Bike Path Project
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2015032032
- Lead Agency
- University of California
- Document Title
- Great Meadow Bike Path Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 5/5/2015
- Present Land Use
- Campus Support (under UC Santa Cruz 2005 Long Range Development Plan)
- Document Description
- The Bike Path Project consists of modifications to improve bicycle safety at the intersection of the existing Great Meadow Bike Path and Village Road, an existing Campus road. The Great Meadow Bike Path on the UCSC campus is a recreational and primary bicycle access route to central developed campus facilities and to undeveloped recreational areas of the campus. The Bike path is approximately one mile long, with a grade of 5 to 7 percent. The Project would realign and re-grade a portion of the path, reconfigure the intersection with Village Road, and include improvements to warn vehicle drivers and pedestrians of approaching cyclists.
- Contact Information
-
Alisa Klaus
University of California, Santa Cruz
Lead/Public Agency
PP&C, 1156 High Street
Santa Cruz, CA 95064
Phone : (831) 459-3732
Location
- Coordinates
- 36°59'5.17"N 122°3'28.7"W
- Cities
- Santa Cruz
- Counties
- Santa Cruz
- Cross Streets
- High Street / Bay Drive
- Zip
- 95064
- Total Acres
- 6
- Parcel #
- 001-011-13
- State Highways
- Hwy 1, 17, 9
- Schools
- Westlake ES
- Waterways
- Moore Creek, Jordan Gulch, San Lorenzo River
- Township
- 11S
- Range
- 2W
- Base
- MDB&M
Notice of Determination
- Approving Agency
- UC Santa Cruz
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- UC Santa Cruz, 1156 High St, PP&C-Barn G, Santa Cruz, CA 95064
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.