Willow Hill Reservoir Multi-Use Trail
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2015032010
- Lead Agency
- City of Folsom
- Document Title
- Willow Hill Reservoir Multi-Use Trail
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 5/1/2015
- Present Land Use
- Open Space
- Document Description
- The City of Folsom proposes to construct a new multi-use natural earthen trail within the City of Folsom. The trail will be approximately 2 miles long and 6 feet wide and will be constructed by volunteers using hand tools and a small bobcat (such as a Bobcat 570 MINI). A single-span bridge will be constructed over the riparian area near the west end of the project (Figure 2). The bridge will be approximately 60 feet long and 6 feet wide with concrete abutments. The bridge will be made of pressure-treated wood and is proposed to be assembled onsite. This project has incorporated design features to avoid potential environmental impacts.
- Contact Information
-
Jim Konopka
City of Folsom
Lead/Public Agency
50 Natoma Street
Folsom, CA 95630
Phone : (916) 351-3516
Location
- Coordinates
- 38°38'32"N 121°8'48"W
- Cities
- Folsom
- Counties
- Sacramento
- Cross Streets
- Iron Point Road between East Bidwell Street and Prairie City Road
- Zip
- 95630
- Total Acres
- 1
- Parcel #
- 072-1190-multi; 072-3120-multi
- State Highways
- Hwy 50
- Schools
- Folsom lake High
- Waterways
- Alder Creek
- Township
- 9N
- Range
- 8E
- Section
- 7
- Base
- MDB&M
Notice of Determination
- Approving Agency
- City of Folsom
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- City of Folsom, 50 Natoma Street, Folsom, CA 95630
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.