Palos Verdes Reservoir Upgrades Project

3 Documents in Project

Summary

SCH Number
2015031074
Lead Agency
Metropolitan Water District of Southern California
Document Title
Palos Verdes Reservoir Upgrades Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Open Space
Document Description
The reservoir is now 74 years old, the existing gunite liner has reached the end of its useful life and requires replacement. The project would remove the upper portion of the outlet tower down to grade and replace the valves and their operating system, reline the reservoir, modify the spillway, and install a new floating cover. In addition, the Water Quality laboratory will be updated with new counters and sink and the chemical feed system will be updated with new pipes and valves.

Contact Information

Name
Malinda Stalvey
Agency Name
Metropolitan Water District of Southern California
Contact Types
Lead/Public Agency

Location

Cities
Rolling Hills Estates
Counties
Los Angeles
Cross Streets
Palos Verdes Drive North and Palos Verdes Drive East
Zip
90274
Parcel #
7554001903
State Highways
Hwy 1, 213, 110
Airports
Torrance
Schools
Dodson MS
Waterways
Machado Lake

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Parks and Recreation, California Department of Transportation, District 7 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Los Angeles Region 4 (RWQCB), Department of Water Resources, Resources Agency, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance, California Department of Fish and Wildlife, South Coast Region 5 (CDFW)
State Reviewing Agency Comments
California Department of Fish and Wildlife, South Coast Region 5 (CDFW)
Development Types
Other (Potable Water Storage Reservoir)
Local Actions
Reservoir Maintenance
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Public Services, Recreation, Transportation, Wildfire, GHG

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print