Desert Quartzite Solar Project (EPIMS-RIV-19221-R6)

5 Documents in Project

Summary

SCH Number
2015031066
Lead Agency
Riverside County
Document Title
Desert Quartzite Solar Project (EPIMS-RIV-19221-R6)
Document Type
NOD - Notice of Determination
Received
Posted
3/24/2022
Document Description
The overall Project consists of a utility-scale solar photovoltaic (PV) electrical generating and battery energy storage system (BESS) and associated infrastructure facilities, and a proposed 230-kilovolt (kV) generator-tie line (gen-tie) connecting to the Southern California Edison (SCE) Colorado River Substation. The Project is expected to generate 450 megawatts (MW) of renewable energy. The overall Project is divided into two separate project areas. Project A consists of a utility-scale solar PV electrical generating and BESS and associated infrastructure facilities. Project B consists of installation of telecommunications and electrical supply lines.

Contact Information

Name
Dr. Shankar Sharma
Agency Name
Fish and Wildlife, Region 6
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
Riverside
Regions
Southern California
Township
7S
Range
21E
Other Information
located in the Palo Verde Mesa region of eastern Riverside County, California, at southwest of the City of Blythe, and south of the Interstate 10 freeway. The Project site is situated on the Roosevelt Mine and Ripley 7.5’

Notice of Determination

Approving Agency
Fish and Wildlife, Region 6
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Riverside
Final Environmental Document Available at
County of Riverside 4080 Lemon Street, 12thFloor Riverside, CA 92502

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.