installation and Implementation of Advanced Marine Emission Control System (AMECS) at the TAMT

7 Documents in Project

Summary

SCH Number
2015031046
Lead Agency
San Diego Unified Port District
Document Title
installation and Implementation of Advanced Marine Emission Control System (AMECS) at the TAMT
Document Type
NOD - Notice of Determination
Received

Document Description
The proposed project involves installation and implementation of an Advanced Marine Emission Control System (AMECS) or Bonnet System at the Tenth Avenue Marine Terminal (TAMT) in accordance with Mitigation Measure Air Quality No. 9, which was identified in the FEIR for the TAMT Redevelopment Plan Project. The AMECS Bonnet System would be located on a barge and would be capable of moving to different berths at TAMT and/or to the Districts other maritime terminals. The primary goal of the AMECS Bonnet System is to reduce vessel hoteling emissions. It would be used primarily, although not exclusively, at the TAMT.

Contact Information
Larry Hofreiter
San Diego Unified Port District
3165 Pacific Highway
San Diego, CA 92101

916-327-1556

Location

Coordinates
32°41'57"N 117°9'22"W
Cities
San Diego
Counties
San Diego
Cross Streets
Harbor Drive and Cesar Chavez Parkway (687 Switzer Street)
Zip
92101
Total Acres
96
Parcel #
020-183; 020-091; 020-025; 020-039
State Highways
I-5
Railways
BNSF
Schools
Perkins Elementary
Waterways
San Diego Bay
Other Location Info
Barrio Logan

Notice of Determination

Approving Agency
San Diego Unified Port District
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
3165 Pacific Highway, San Diego, CA 92101

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
Yes
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search