Implementation and Installation of Renewable Microgrid at TAMT - 2nd Addnedum to TAMT Final EIR
8 Documents in Project
Summary
SCH Number
2015031046
Lead Agency
San Diego Unified Port District
Document Title
Implementation and Installation of Renewable Microgrid at TAMT - 2nd Addnedum to TAMT Final EIR
Document Type
NOD - Notice of Determination
Received
Posted
4/13/2018
Present Land Use
Port Master Plan designates the 96-acre area as either Marine Terminal or Marine Related.
Document Description
The proposed project involves implementing a renewable microgrid at the TAMT in accordance with Mitigation Measure Greenhouse Gas No. 6, which was identified in the Final EIR for the TAMT Redevelopment Plan Project. The design includes Retrofitting the roof at TAMT either Warehouse B or Warehouse C Retrofitting existing high mast lighting (approx. 29 light poles) to energy efficient site lighting. Installing of a 700 kilowatt solar PV system on Warehouse B or C between 30,000 & 60,000 SF in size. Installing a 700 kW/2,500 kilowatt hour ground mounted battery system. Minor trenching and repaving. Installing various electrical upgrades.
Contact Information
Name
Larry Hofreiter
Agency Name
San Diego Unified Port District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
San Diego
Counties
San Diego
Cross Streets
Harbor Drive and Cesar Chavez Parkway (687 Switzer Street)
Zip
92101
Total Acres
96
Parcel #
020-183; 020-091; 020-025; 020-039
State Highways
I-5
Railways
BNSF
Schools
Perkins Elementary
Waterways
San Diego Bay
Other Location Info
Barrio Logan
Notice of Determination
Approving Agency
San Diego Unified Port District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes