Tenth Avenue Marine Terminal Demolition & Initial Rail Component Project - Addendum to Final EIR

8 Documents in Project

Summary

SCH Number
2015031046
Lead Agency
San Diego Unified Port District
Document Title
Tenth Avenue Marine Terminal Demolition & Initial Rail Component Project - Addendum to Final EIR
Document Type
NOD - Notice of Determination
Received
Posted
7/12/2017
Present Land Use
Port Master Plan designates the 96-acre area as either Marine Terminal or Marine Related.
Document Description
Proposed project is for the near term Demolition and Initial Rail Component Project, which would demolish two under-utilized transit sheds and install an automated rail lubricator and compressed air system on existing tracks. As a result of final engineering design that was completed in May 2017, the project results in a 5,000 sq. ft. modular office facility instead of 3,600 sq. ft., a new 780-sq. ft. support structure located at the southern end of the terminal, and other minor, technical changes to the project's utility improvements and grading. No changes were made to the Tenth Avenue Marine Terminal's long-term Redevelopment Plan.

Contact Information

Name
Larry Hofreiter
Agency Name
San Diego Unified Port District
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
Harbor Drive and Cesar Chavez Parkway (687 Switzer Street)
Zip
92101
Total Acres
96
Parcel #
020-183; 020-091; 020-025; 020-039
State Highways
I-5
Railways
BNSF
Schools
Perkins Elementary
Waterways
San Diego Bay
Other Location Info
Barrio Logan

Notice of Determination

Approving Agency
San Diego Unified Port District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.