Well 7B and New Storage Reservoir Project

2 Documents in Project

Summary

SCH Number
2015031008
Lead Agency
Twentynine Palms Water District
Document Title
Well 7B and New Storage Reservoir Project
Document Type
NOD - Notice of Determination
Received
Posted
4/23/2015
Present Land Use
Low Density Residential

Document Description
The proposed project includes the construction of a new 42,000 gallon water collection reservoir and installation of a new well, No. 7B, designed to replace existing Well No. 7 that has been removed from production due to age of the well resulting in reduced capacity. The purpose of the proposed reservoir is to replace the existing reservoir that has deteriorated due to the lack of an adequate interior coating that will continue to allow blending of water produced from three local wells for distribution to the District's water supply system. The proposed project includes the drilling, testing, development and equipping and production of a new water production well (Well No. 7B) within the District's Plant No. 6 water production site.

Contact Information
Ray Kolisz
San Bernardino County
385 N. Arrowhead Avenue, 2nd Floor
San Bernardino, CA 92415

Phone : (760) 367-7546

Location

Coordinates
34°8'4"N 116°8'34"W
Cities
Twentynine Palms
Counties
San Bernardino
Cross Streets
29 Palms Hwy & Shoshone Valley Road
Zip
92277
Total Acres
3
State Highways
Hwy 62
Township
1S
Range
9W
Section
33
Base
SBB&M

Notice of Determination

Approving Agency
Twentynine Palms Water District
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
Twentynine Palms Water District, 72401 Hatch Road, Twentynine Palms, CA 92277

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print