State Route 57/Lambert Road Interchange Improvement Project

5 Documents in Project

Summary

SCH Number
2015031005
Lead Agency
California Department of Transportation, District 12
Document Title
State Route 57/Lambert Road Interchange Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
11/30/2015
Document Description
Caltrans, in cooperation with the City of Brea (City), proposes to improve the SR 57/Lambert Road interchange from post mile 20.1 to PM 21.8. The proposed project would improve traffic operations on SR-57 and Lambert Road, in the interchange area. Improvements would include widening the southbound SR-57 median shoulder, reconfiguring the northbound and southbound SR-57 on- and off-ramps, lowering the Lambert Road profile to provide 15-foot standard vertical clearance under the Lamber Road Undercrossing and widening Lambert Road from 1,000 feet west of State College Blvd to Pointe Drive, and reconfiguring the north and southbound SR-57 on- and off-ramp/Lambert Road intersections.

Contact Information

Name
Paul Cochran
Agency Name
California Department of Transportation, District 12
Contact Types
Lead/Public Agency

Location

Cities
Brea
Counties
Orange
Cross Streets
SR-57, Lambert Road, State College Blvd, N. Associated Drive
Total Acres
107.89
State Highways
SR-57
Waterways
8 drainage features, Fullerton Creek
Base
SBB&M

Notice of Determination

Approving Agency
Caltrans District 12
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print