State Route 57/Lambert Road Interchange Improvement Project
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2015031005
- Lead Agency
- California Department of Transportation, District 12
- Document Title
- State Route 57/Lambert Road Interchange Improvement Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/30/2015
- Document Description
- Caltrans, in cooperation with the City of Brea (City), proposes to improve the SR 57/Lambert Road interchange from post mile 20.1 to PM 21.8. The proposed project would improve traffic operations on SR-57 and Lambert Road, in the interchange area. Improvements would include widening the southbound SR-57 median shoulder, reconfiguring the northbound and southbound SR-57 on- and off-ramps, lowering the Lambert Road profile to provide 15-foot standard vertical clearance under the Lamber Road Undercrossing and widening Lambert Road from 1,000 feet west of State College Blvd to Pointe Drive, and reconfiguring the north and southbound SR-57 on- and off-ramp/Lambert Road intersections.
- Contact Information
-
Paul Cochran
California Department of Transportation, District 12
Lead/Public Agency
3347 Michelson Drive, Suite 100
Irvine, CA 92612
Phone : (949) 724-2861
Location
- Coordinates
- 33°55'28.6"N 117°52'48.7"W
- Cities
- Brea
- Counties
- Orange
- Cross Streets
- SR-57, Lambert Road, State College Blvd, N. Associated Drive
- Total Acres
- 107.89
- State Highways
- SR-57
- Waterways
- 8 drainage features, Fullerton Creek
- Base
- SBB&M
Notice of Determination
- Approving Agency
- Caltrans District 12
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 3347 Michelson Drive, Suite 100, Irvine, CA 92612-1692
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.