Lake or Streambed Alteration Agreement No. 1600-2014-0328-R1
Summary
SCH Number
2015029007
Lead Agency
City of Corning
Document Title
Lake or Streambed Alteration Agreement No. 1600-2014-0328-R1
Document Type
NOD - Notice of Determination
Received
Posted
2/26/2015
Document Description
The project is limited to the installation of a storm drain outfall structure that will permanently impact approximately 0.001 acres (10 linear feet) of jurisdictional habitat. The outfall structure will carry water from a detention basin through a pipe into a concrete structure with rip-rap at the toe for energy dissipation. The concrete structure (0.03 cubic yards) and energy dissipating rip-rap (0.09 cubic yards) will be the fill materials. The concrete structure will be formed and then placed in the jurisdictional area.
Contact Information
Name
Donna L. Cobb
Agency Name
CDFW Northern Region
Contact Types
Lead/Public Agency
Phone
Location
Cities
Corning
Counties
Tehama
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.