Davenport Recycled Water Project

4 Documents in Project

Summary

SCH Number
2015022075
Lead Agency
Santa Cruz County
Document Title
Davenport Recycled Water Project
Document Type
NOD - Notice of Determination
Received
Posted
4/23/2015
Present Land Use
Z: Commercial Agriculture, Commercial Agriculture (Preserve), County Right-of-Way GP: Agriculture, County Right-of-way
Document Description
The proposed project would include treatment plant upgrades consisting of: (1) Dredging the treatment lagoon of accumulated solids; (2) installing alarms for the filtration and disinfection processes; and (3) Adding redundancy for coagulant and hypochlorite dosing. The District proposes to construct a storage pond within the Coast Dairies be constructed adjacent to the storage pond. Distribution piping would be constructed to provide recycled water to two irrigation ponds on the seaward side of Highway 1 across from the treatment plant. This new pipeline would include jacking and boring a casing pipe under Highway 1 and the railroad of right-of-way.

Contact Information

Name
Kathleen Molloy Previsich
Agency Name
Santa Cruz County
Contact Types
Lead/Public Agency

Location

Counties
Santa Cruz
Cross Streets
Highway 1 and Cement Plant Road
Zip
95017
Total Acres
415
Parcel #
058-022-11; primary
State Highways
Hwy 1
Railways
Santa Cruz
Airports
No
Schools
Pacific ES
Waterways
San Vicente Creek, Stream 102, and Agua Puera Creek
Township
10S
Range
3W
Section
29/30
Base
MDB&M
Other Location Info
Davenport

Notice of Determination

Approving Agency
County of Santa Cruz
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print