Echo Summit Bridge Repair or Replacement
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2015022055
- Lead Agency
- Caltrans 3 (Marysville) (California Department of Transportation, District 3)
- Document Title
- Echo Summit Bridge Repair or Replacement
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 1/25/2017
- Present Land Use
- Public Land, Residential
- Document Description
- To replace the Echo Summit Viaduct with a single-span bridge. The new bridge will have two 12-ft. wide lanes with 1-ft wide shoulder on each side and 3-ft tall concrete barrier on the east side. The project also includes upgrading MBGR to current standards, grinding the AC at the bridge approach, and placing a smooth transition from the approach roadway to the new PCC deck. Pot holing, paving, and striping may be completed on a selected detour route in order to prepare for detoured traffic during construction.
- Contact Information
-
Napassakorn Pongsmas
California Department of Transportation, District 3
703 B Street
Marysville, CA 95901
Phone : (530) 741-5387
Location
- Cities
- South Lake Tahoe
- Counties
- El Dorado
- Cross Streets
- Johnson Pass Road
- Zip
- 96150
- State Highways
- US 50
- Airports
- Lake Tahoe Airport
Notice of Determination
- Approving Agency
- Caltrans
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 703 B Street, Marysville, CA 95901
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.