Wastewater Treatment Plant (WWTP) Flood Protection Project (Lake or Streambed Alteration Agreement No. 1600-2015-0067-R1)

3 Documents in Project

Summary

SCH Number
2015022051
Lead Agency
City of Fortuna
Document Title
Wastewater Treatment Plant (WWTP) Flood Protection Project (Lake or Streambed Alteration Agreement No. 1600-2015-0067-R1)
Document Type
NOD - Notice of Determination
Received
Posted
6/12/2015
Present Land Use
Z: Public Facility GPLU: Public and Industrial
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number 1600-2015-0067-R1, pursuant to section 1602 of the Fish and Game Code to the project Applicant, City of Fortuna as represented by Mr. Merritt Perry. The Project is limited to three encroachments; one encroachment to construct a new berm around the WWTP to a level equal to or above the 100 year flood elevation, once encroachment to install the new effluent outflow pipe to function during high stream flow conditions, and one encroachment to remove riparian vegetation for the construction of the new berm and outflow pipe.

Contact Information

Name
David Manthorne
Agency Name
CDFW Northern Region
Contact Types
Lead/Public Agency

Location

Cities
Fortuna
Counties
Humboldt
Cross Streets
Dinsmore Drive/Riverwalk Drive
Zip
95540
Parcel #
200-352-005 & 004, 200-353-028
State Highways
Hwy 101
Schools
Fortuna High, Middle
Waterways
Strongs Creek, Rohner Creek, Eel River, Hillside Creek
Township
2
Range
1W
Section
2
Base
HB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print