White Slough Tidal Wetlands Restoration Project (Streambed Alteration Agreement No. 1600-2015-0073-R1)

4 Documents in Project

Summary

SCH Number
2015022040
Lead Agency
Coastal Conservancy, California State (California State Coastal Conservancy)
Document Title
White Slough Tidal Wetlands Restoration Project (Streambed Alteration Agreement No. 1600-2015-0073-R1)
Document Type
NOD - Notice of Determination
Received
Posted
8/10/2015
Present Land Use
Agriculture Exclusive - 60 ac with combining zone overlays for Flood Hazard, Riparian Habitat, and Transitional Agriculture

Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2015-0073-R1, pursuant to section 1602 of the fish and game code to the project applicant, Mr. Eric Nelson representing USFWS Humboldt Bay National Wildlife Refuge. The project is limited to 1 encroachment to temporarily realign stream channel and divert flows in the terminal reach of Chism Creek to dewater an access and staging area for a larger tidal wetlands restoration project (26 acres), and upon completion realigned and restored channel into the middle basin of the restoration area (approximately 580 ft in length and 820 cu yds of excavation), and the banks planted with riparian vegetation.

Contact Information
Clare Golec
CDFW Region 1
619 Second Street
Eureka, CA 95501

Phone : (707) 441-2064

Location

Coordinates
40°42'18.17"N 124°12'39.79"W
Counties
Humboldt
Cross Streets
Highway 101 at Tompkins Hill Road
Zip
95537
Total Acres
56
Parcel #
307-05-201, -203, -206, 307-04-201
State Highways
Hwy 101
Railways
NWP
Airports
No
Schools
College of the Redwoods
Waterways
White Slough, Hookton Slough, Humboldt Bay
Township
4N
Range
1W
Section
29
Base
HB&M
Other Location Info
Fields Landing

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
CDFW Region1, 619 2nd Street, Eureka, CA 95501

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search