Yolo 16 Safety Improvement Project (Lake or Streambed Alteration Agreement No. 1600-2016-0200-R2)
5 Documents in Project
Summary
SCH Number
2015022031
Lead Agency
California Department of Transportation, District 3
Document Title
Yolo 16 Safety Improvement Project (Lake or Streambed Alteration Agreement No. 1600-2016-0200-R2)
Document Type
NOD - Notice of Determination
Received
Posted
12/13/2016
Present Land Use
Residential, Agricultural
Document Description
CDFW has executed Lake and Streambed Alteration Agreement NO. 1600-2016-0200-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Caltrans.
The purpose of this project is to improve safety at three locations along SR 16. The project includes: widening and paving shoulders; adding a left turn pocket for County Road 79; straightening two horizontal curves (increasing the curve radius); replacing or extending storm drainage culverts; shifting the alignment south to reduce impacts to Taylor Creek. Taylor Creek will be realigned in order to accommodate the new width of the freeway; flattening the vertical curve (increasing the length); shifting the alignment to the north to avoid residential and commercial development; adding a Two Way Left Turn Lane (TWLTL) from 560 feet west of CR-86A to 570 feet east of CR-86A; adding a TWLTL form 100 feet west of Tutt Street to CR-90; adding a roundabout at the SR-16/CR-89 intersection. At South Fork Willow Slough the project will remove the existing concrete box culvert and install a 16'x11'x65' concrete box culvert and install 4 box culvert wing walls.
Contact Information
Name
Juan Lopez Torres
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Counties
Yolo
Cross Streets
Various locations along SR 16
Zip
95627
State Highways
Hwy 16
Schools
Esparto HS
Waterways
Cache Creek
Other Location Info
Esparto/Madison
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.