American River Pipeline Conveyance Project
6 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2015022027
- Lead Agency
- Carmichael Water District
- Document Title
- American River Pipeline Conveyance Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 4/22/2015
- Present Land Use
- Sacramento County - Residential (R2); City of Rancho - Parks and Open Space (POS), Residential (R5)
- Document Description
- The Proposed Project consists of: 1) pipeline construction from the Bajamont WTP under the American River to the existing water distribution system in Rancho Cordova; 2) abandoned pipeline removal across the American River to improve safety; 3) culvert replacement and bank stabilization at the unnamed drainage on the north bank; and 4) stream restoration along the north bank of the American River. The Project will provide treated water to GSWC to replace groundwater affected by contamination.
- Contact Information
-
Steve Nugent
Carmichael Water District
7837 Fair Oaks Boulevard
Carmichael, CA 95608
Phone : (916) 483-2452
Location
- Coordinates
- 38°37'31"N 121°18'13"W
- Cities
- Rancho Cordova
- Counties
- Sacramento
- Cross Streets
- Rossmoor Drive and Coloma Road
- Zip
- 95670
- Total Acres
- 4
- Parcel #
- USGS: Citrus Heights, Carmichael
- State Highways
- Hwy 50
- Railways
- No
- Airports
- No
- Schools
- Williamson ES
- Waterways
- American River
- Township
- 9N
- Range
- 6E
- Base
- MDB&M
- Other Location Info
- Carmichael
Notice of Determination
- Approving Agency
- Carmichael Water District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Carmichael Water District, 7837 Fair Oaks Blvd., Carmichael, CA 95608
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.