Ralston Middle School Expansion and Synthetic Turf Field Installation Project
2 Documents in Project
Summary
SCH Number
2015022019
Lead Agency
Belmont-Redwood Shores School District
(BRSSD)
Document Title
Ralston Middle School Expansion and Synthetic Turf Field Installation Project
Document Type
NOD - Notice of Determination
Received
Posted
3/13/2015
Present Land Use
Z: SC-School and Other Compatible Uses
GPD: Public Facility (P)
Document Description
The project is the construction of a new two-story building with eight classrooms and a courtyard at Ralston Middle School, to serve an anticipated increase in student enrollment. The proposed classroom building will be located in a currently paved area of the campus used as a 48-space parking lot and basketball courts. Construction of the classroom building in this area of the campus will require restriping of the parking lot to include 49 parking spaces (a net increase of one space). Additionally, an 8,700 square foot (sf) area in the northeastern corner of the school's sports field will be asphalt paved to allow the basketball courts to be relocated and reconfigured south of their existing location. The overall project will result in a net loss of three half-sized basketball courts. The project also evaluates replacement of the school's natural turf sports field with a synthetic turf sports field, in case the District decides to pursue this option in the future.
Contact Information
Name
Michael Milliken
Agency Name
Belmont-Redwood Shores School District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Belmont
Counties
San Mateo
Cross Streets
Ralston Avenue and Tahoe Drive
Zip
94002
Total Acres
14.98
Parcel #
043-340-010
State Highways
Hwy 92
Schools
Ralston MS
Waterways
Belmont Creek
Township
5S
Range
4W
Base
MDB&M
Notice of Determination
Approving Agency
Belmont Redwood Shores School District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.