Pennington Road Bridge (Lake or Streambed Alteration Agreement No. 1600-2014-0213-R2).

4 Documents in Project

Summary

SCH Number
2015022017
Lead Agency
Sutter County
Document Title
Pennington Road Bridge (Lake or Streambed Alteration Agreement No. 1600-2014-0213-R2).
Document Type
NOD - Notice of Determination
Received
Posted
3/20/2015
Present Land Use
Roadway
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number 1600-2014-0213-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Sutter County. The project is limited to the replacement of the existing bridge on Pennington Road over the Sutter Butte Canal. The existing bridge will be demolished, removed from the canal and disposed of at a proper facility. The new bridge will be constructed 40-feet long by 31-feet wide with reinforced concrete abutments. The roadway approaches will be widened by 1,610-square feet to accommodate the new structure. Fill will be required along the bank where the existing bridge abutments will be replaced and rock rip-rap will be installed. In-water work will be needed for the removal of the existing pier wall. A sheet piling will be used to temporarily dewater the areas immediately surrounding the portions of the banks where construction will occur.

Contact Information

Name
Tanya Sheya
Agency Name
CDFW North Central Region
Contact Types
Lead/Public Agency

Location

Cities
Live Oak
Counties
Sutter
Cross Streets
SR 99
Zip
95953
Total Acres
1.47
State Highways
Hwy 99
Waterways
Feather River
Township
16N
Range
3E
Section
4

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.