Emergency Pipeline Tie-in Project

2 Documents in Project

Summary

SCH Number
2015021086
Lead Agency
Heritage Ranch Community Services District
Document Title
Emergency Pipeline Tie-in Project
Document Type
NOD - Notice of Determination
Received
Posted
4/22/2015
Present Land Use
undeveloped / Rural Lands, Residential Suburban
Document Description
Provides emergency access to current Nacimiento water entitlement during no-or-low-flow conditions. Project connects existing water pump station 1 to the Nacimiento Water Project (NWP) with a 4-inch pipeline, requires installation of approx. 1,250 ft of 4-inch diameter pipeline adjacent to and under the Nacimiento River, & connection to the NWP at existing air & vacuum valve through installation of a sub-surface vault. Pipeline installation would be completed through a combination of conventional trenching methods along the banks & horizontal directional drilling under the Nacimiento River. Project construction would require disturbance of approx. 0.25 acre over 1-2 months.

Contact Information

Name
John D'Ornellas
Agency Name
Heritage Ranch Community Services District
Contact Types
Lead/Public Agency

Location

Cities
Paso Robles
Counties
San Luis Obispo
Cross Streets
Nacimiento Lake Drive and Bluegill Drive
Zip
93446
Parcel #
080-91-019; 012-371-004
Waterways
Nacimiento River
Township
25S
Range
10E
Section
15
Base
MDB&M
Other Location Info
Heritage Ranch

Notice of Determination

Approving Agency
Heritage Ranch Community Services District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print