Emergency Pipeline Tie-in Project
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2015021086
- Lead Agency
- Heritage Ranch Community Services District
- Document Title
- Emergency Pipeline Tie-in Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 4/22/2015
- Present Land Use
- undeveloped / Rural Lands, Residential Suburban
- Document Description
- Provides emergency access to current Nacimiento water entitlement during no-or-low-flow conditions. Project connects existing water pump station 1 to the Nacimiento Water Project (NWP) with a 4-inch pipeline, requires installation of approx. 1,250 ft of 4-inch diameter pipeline adjacent to and under the Nacimiento River, & connection to the NWP at existing air & vacuum valve through installation of a sub-surface vault. Pipeline installation would be completed through a combination of conventional trenching methods along the banks & horizontal directional drilling under the Nacimiento River. Project construction would require disturbance of approx. 0.25 acre over 1-2 months.
- Contact Information
-
John D'Ornellas
Heritage Ranch Community Services District
Lead/Public Agency
4870 Heritage Road
Paso Robles, CA 93446
Phone : (805) 227-6230
Location
- Coordinates
- 35°45'31"N 120°52'26"W
- Cities
- Paso Robles
- Counties
- San Luis Obispo
- Cross Streets
- Nacimiento Lake Drive and Bluegill Drive
- Zip
- 93446
- Parcel #
- 080-91-019; 012-371-004
- Waterways
- Nacimiento River
- Township
- 25S
- Range
- 10E
- Section
- 15
- Base
- MDB&M
- Other Location Info
- Heritage Ranch
Notice of Determination
- Approving Agency
- Heritage Ranch Community Services District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Heritage Ranch CSD Office, 4870 Heritage Road, Paso Robles, CA 93446
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.