Streambed Alteration Agreement (Agreement) No. 1600-2015-0396-R1, Caltrans Peregrine Slides Repair Project, Russian River Watershed, Mendocino County
4 Documents in Project
Summary
SCH Number
2015021063
Lead Agency
California Department of Transportation, District 3
Document Title
Streambed Alteration Agreement (Agreement) No. 1600-2015-0396-R1, Caltrans Peregrine Slides Repair Project, Russian River Watershed, Mendocino County
Document Type
NOD - Notice of Determination
Received
Posted
1/25/2016
Document Description
CDFW is issuing an agreement for the following six encroachments: 1) an existing 24" pipe culvert at PM 3.72 will be replaced and installed at a lower elevation to match the elevation of the proposed underdrain, 2) a 24" cross drainage culvert at PM 4.95 that was damaged will be replaced with a rock lined channel, 3) the last 40 ft of existing 24" culvert at PM 5.07 will be replaced with 24" corrugated steel pipe, 4) an existing 18" culvert at PM 5.11 will be up-sized to a 36" culvert to convey the additional flow from a new tie-back wall, 5) a 24" abandoned culvert at PM 5.17 will be reconstructed at a lower elevation to take the flow from underdrain at the bottom of the new tie-back wall and horizontal drains, and 6) an existing rock lined ditch and drainage at PM 5.22 will be removed and filled by the construction of a tie-back wall.
Contact Information
Name
Wes Stokes
Agency Name
CDFW
Contact Types
Lead/Public Agency
Address
Phone
Location
Counties
Mendocino
Cross Streets
SR 101 from post miles 3.75 through 5.30
State Highways
SR 101
Waterways
Russian River
Other Location Info
Hopland
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.