Cleanup and Abatement Order No. R9-2015-0018 Laurel Hawthorn Embayment Project

4 Documents in Project

Summary

SCH Number
2015021020
Lead Agency
Regional Water Quality Control Board, Region 9 (San Diego), San Diego (Regional Water Quality Control Board, Region 9)
Document Title
Cleanup and Abatement Order No. R9-2015-0018 Laurel Hawthorn Embayment Project
Document Type
NOD - Notice of Determination
Received

Document Description
Project consists of a proposed excavation/enhanced monitored natural recovery (EMNR) remedial action for a 30-inch storm water conveyance system (SWCS) outfall. The SWCS discharges to the Laurel-Hawthorn Street Embayment east of the former TDY facility located at 2701 outfall. The SWCS discharges to the Laurel-Hawthorn Street Embayment east of the former TDY facility located at 2701 North Harbor Dr. The project would combine a cleanup action involving the direct removal of sediment with an abatement action involving the placement of an EMNR sand layer with activated carbon within an area adjacent to the SWCS outfall in San Diego Bay.

Contact Information
Ashley Wright
SD Unified Port District
P.O. Box 120488
San Diego, CA 92112-0488

619-686-6549

Location

Coordinates
32°43'36"N 117°10'47"W
Cities
San Diego
Counties
San Diego
Cross Streets
N. Harbor Drive and W. Laurel Street
Zip
92101
Total Acres
1
Parcel #
None
State Highways
Hwy 163, I-5
Airports
San Diego Int. Airport
Waterways
San Diego Bay

Notice of Determination

Approving Agency
SD Unified Port District
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
3165 Pacific Hwy, San Diego, CA 92101

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search