Laurel Hawthorn Embayment Remedial Action for the 30-inch SWCS Outfal (CAO # R9-2015-0018) Prj
4 Documents in Project
Summary
SCH Number
2015021020
Lead Agency
Regional Water Quality Control Board, Region 9
Document Title
Laurel Hawthorn Embayment Remedial Action for the 30-inch SWCS Outfal (CAO # R9-2015-0018) Prj
Document Type
NOD - Notice of Determination
Received
Posted
11/18/2016
Present Land Use
The Unified Port of San Diego Master Plan Guidelines for Planning District 3
Document Description
The San Diego RWQCB is issuing a Clean Water Act Section 401 water quality certification (Cert. No. R9-2016-0088) to the project applicant to implement a cleanup action involving the direct removal of sediment with an abatement action involving, dredging to remove PCB contaminated sediment, placement of an enhanced monitored natural recovery (EMNR) sand layer with activated carbon on the bay floor, and rip rap stabilization at the 30-inch Storm Water Conveyance System (SWCS) outfall in the eastern revetment at the project location in the San Diego Bay.
Contact Information
Name
Lisa Honma
Agency Name
Regional Water Quality Control Board, Region 9
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
San Diego
Counties
San Diego
Cross Streets
N. Harbor Drive and W. Laurel Street
Zip
92101
Total Acres
1
Parcel #
None
State Highways
Hwy 163, I-5
Airports
San Diego Int. Airport
Waterways
San Diego Bay
Notice of Determination
Approving Agency
Regional Water Quality Control Board, Region 9
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes