Laurel Hawthorn Embayment Remedial Action for the 30-inch SWCS Outfal (CAO # R9-2015-0018) Prj

4 Documents in Project

Summary

SCH Number
2015021020
Lead Agency
Regional Water Quality Control Board, Region 9
Document Title
Laurel Hawthorn Embayment Remedial Action for the 30-inch SWCS Outfal (CAO # R9-2015-0018) Prj
Document Type
NOD - Notice of Determination
Received
Posted
11/18/2016
Present Land Use
The Unified Port of San Diego Master Plan Guidelines for Planning District 3
Document Description
The San Diego RWQCB is issuing a Clean Water Act Section 401 water quality certification (Cert. No. R9-2016-0088) to the project applicant to implement a cleanup action involving the direct removal of sediment with an abatement action involving, dredging to remove PCB contaminated sediment, placement of an enhanced monitored natural recovery (EMNR) sand layer with activated carbon on the bay floor, and rip rap stabilization at the 30-inch Storm Water Conveyance System (SWCS) outfall in the eastern revetment at the project location in the San Diego Bay.

Contact Information

Name
Lisa Honma
Agency Name
Regional Water Quality Control Board, Region 9
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
N. Harbor Drive and W. Laurel Street
Zip
92101
Total Acres
1
Parcel #
None
State Highways
Hwy 163, I-5
Airports
San Diego Int. Airport
Waterways
San Diego Bay

Notice of Determination

Approving Agency
Regional Water Quality Control Board, Region 9
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print