EMNR Remedial Action for the 30-inch SWCS Outfall 2701 North Harbor Drive, San Diego, CA
4 Documents in Project
Summary
SCH Number
2015021020
Lead Agency
Regional Water Quality Control Board, Region 9
Document Title
EMNR Remedial Action for the 30-inch SWCS Outfall 2701 North Harbor Drive, San Diego, CA
Document Type
NOD - Notice of Determination
Received
Posted
11/9/2015
Present Land Use
The Unified Port of San Diego Master Plan Guidelines for Planning District 3
Document Description
The project consists of a proposed excavation/enhanced monitored natural recovery (EMNR) remedial action for a 30-inch storm water conveyance system (SWCS) outfall. The SWCS discharges to the Laurel-Hawthorn Street Embayment east of the former TDY facility located 2701 North Harbor Drive, in San Diego, CA. The project will combine a cleanup action involving the direct removal of sediment with an abatement action involving the placement of an enhanced monitored natural recovery (EMNR) sand layer with activated carbon within an area adjacent to the SWCS outfall in San Diego Bay.
Contact Information
Name
David W. Gibson
Agency Name
Regional Water Quality Control Board, Region 9
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
San Diego
Counties
San Diego
Cross Streets
N. Harbor Drive and W. Laurel Street
Zip
92101
Total Acres
1
Parcel #
None
State Highways
Hwy 163, I-5
Airports
San Diego Int. Airport
Waterways
San Diego Bay
Notice of Determination
Approving Agency
Regional Water Quality Control Board, Region 9
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.