Amendments to the Water Quality Control Plan for the Sacramento River and San Joaquin River Basins to Edit and Update Language
Summary
SCH Number
2015019007
Lead Agency
Regional Water Quality Control Board, Region 5 (Central Valley), Sacramento
Document Title
Amendments to the Water Quality Control Plan for the Sacramento River and San Joaquin River Basins to Edit and Update Language
Document Type
NOD - Notice of Determination
Received
Posted
1/26/2015
Document Description
Basin Plan amendments to correct the description of the boundary between the San Joaquin River Basin and the Tulare Lake Basin; remove, correct and update footnotes in several tables; correct typographical errors; and update references to the California Department of Public Health and the California Department of Fish and Wildlife. In addition, the amendments will incorporate the State Water Resources Control Board policies for supplemental environmental projects, compliance schedules and recycled water and update the incorporation of the implementation policy for toxics and the enforcement policy.
Contact Information
Name
Betty Yee
Agency Name
Regional Water Quality Control Board, Region 5 (Central Valley),
Contact Types
Lead/Public Agency
Phone
Location
Counties
Sacramento, San Joaquin
Other Location Info
Sacramento River and San Joaquin River Basins which stretch from the Oregon border to the San Joaquin River and from the crests of the Coast Ranges to the crests of the Sierra Nevada.
Notice of Determination
Approving Agency
CA Regional Water Quality Control Board Central Valley
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.